Flexibility in the use of different materials, engineering expertise and structures made to perfection.
We engineer and build great structure, public and private, which always satisfy the customer’s expectations. Avantgarde structures that rewrite the rules of doing: time, performance, costs and safety at work.
For example the famous Tree of Life, symbol of Expo Milano 2015, or the Strand East Tower in London, built in one month on the occasion of the 2012 Olympic Games or, again, “La Fenice” Theater in Venice, which we rebuilt “as it was and where it was “respecting each legal obligation. Today, after more than 30 years of experience, we believe than every challenge is possible, thanks to a strong industrialization of the construction process, which allows us to obtain excellent results, both for time and for quality of the building.
Certified construction technologies
General Contractor
Engineering competence
Important customized projects
Flexibility in the use of different materials
Short building times
Certain cost
An intervention commissioned and financed by the Fini Group for Marco Brunelli, who transformed the former “Maestoso” cinema into a new concept Hypermarket, which occupies an area of over 4,000 square meters.
PRODUCTION CAPACITY
PRODUCTION AREA
BUILDINGS REALIZED IN A YEAR